In the installation and commissioning phase, Xinhai adheres to the principle of prioritizing client interests and provides comprehensive installation and commissioning services. Xinhai is responsible for all tools, materials, and personnel required for installation and commissioning, and the client awaits the final results.
-
Agitation Tank On-site Installation Guide
-
Installation Progress Implementation Chart
Xinhai professional Installation and Commissioning Project Departments handle equipment installation and process commissioning year-round, both domestically and internationally. They have accumulated rich practical experience and possess the capability to undertake over 25 installation and commissioning projects simultaneously, showcasing Xinhai professional strength and efficient execution.
Xinhai Installation and Commissioning team encompasses all aspects of mine EPC projects, including Mineral Processing Tests, Mineral Processing Technology, Equipment Selection, Mine Design, Equipment Customization, Equipment Installation, and Process Commissioning. The technical personnel in each segment fully understand the actual conditions of mining projects and work collaboratively to ensure the smooth progress of mining projects. In the later stages of each mining project's Installation and Commissioning, Xinhai EPC Project Engineering Department conducts Operation Training, Maintenance and Repair Training, and Emergency Response Training on-site for the client employees, ensuring the smooth delivery of the mining project.
Simultaneously, Xinhai utilizes advanced 3D Design Software to perform modular and combined design for equipment, non-standard parts, and pipelines. In the production workshop, Xinhai has developed various processing fixtures and combination modules to achieve standardized manufacturing of modular and combined designs. Furthermore, by simulating the installation process management and integrating plans with BIM (Building Information Modeling), Xinhai has broken through traditional installation process management methods. This approach enables Xinhai to grasp project construction dynamics at any time, precisely manage installation information, and control project progress, thereby further enhancing installation and commissioning process management capabilities. Through this digital installation guidance method, the overall installation and commissioning work for the mine becomes more convenient.
TECHNICAL TRAINING
Xinhai is committed to ensuring the stable operation of mine projects by providing Technical Training, Equipment Operation Training, Production Management Training, Maintenance Training, and Safety Protection Training, helping clients build their technical teams. Additionally, Xinhai has compiled manuals such as 'Common Mining Equipment Fault Handling,' 'Mineral Processing Plant Operation and Maintenance Procedures,' and 'Equipment Operation, Maintenance, and Repair Procedures' to comprehensively enhance the technical competence of mine operation workers.
Meeting Standards and Achieving Production
Xinhai comprehensive services for Meeting Standards and Achieving Production include achieving the agreed Recovery Rate, realizing the designed Production Capacity, meeting the agreed Product Quality requirements, aligning Consumption Indicators with agreed standards, effectively controlling Production Costs, and ensuring stable operation of Process Equipment. To achieve these goals, Xinhai has established a scientific and efficient assessment system, ensuring that each EPCM+O project can be completed in an orderly manner according to standardized, procedural, and institutional methods.
The assessment focus of EPCM+O projects is on timely completion, meeting standards, and achieving production. Leveraging over 20 years of comprehensive mine services experience and more than 500 EPCM+O project practices, Xinhai can reliably achieve the goal of 'on-time, meeting standards, and achieving production.'